Active Projects

At Pars Drilling Fluids, we are actively supporting a range of drilling operations by delivering reliable, high-performance drilling fluid solutions tailored to the unique requirements of each project.

Our ongoing work spans exploration, development, and production wells, where we provide customized fluid systems, technical engineering support, and continuous on-site monitoring to maximize drilling efficiency, maintain wellbore stability, and minimize operational risks. Through a commitment to innovation, quality, and environmental responsibility, we work closely with our clients to optimize drilling performance while ensuring compliance with industry standards and project-specific objectives.

Projects
South Pars Phase 11A
Drilling Fluid Services

Year: 2025-Current

Oil Company: POGC

Contractor: PETROPARS

Depth(m): 3400±400  

Temperature (F): ±210

Wells: 12   

Rigs: 1

South Pars - Infill
Drilling Fluid Services

Year: 2024-Current

Oil Company: POGC 

Contractor: PECO   

Depth(m): 3200±400 

Temperature (F): ±210

Wells: 4   

Rigs: 1

South Pars - Infill
Drilling Fluid Services

Year: 2024- Current

Oil Company: POGC

Contractor: DCI   

Depth(m): 3200±400 

Temperature (F): ±210

Wells: 9     

Rigs: 1 

South Pars - Phase - 11B
Drilling Fluid Services

Year: 2024-Current

Oil Company: POGC 

Contractor: PETROPARS

Depth (m): 3400±400

Temperature (F): ±210

Well: 2

Rigs: 2 Onshore Rigs

Sohrab
Drilling Fluid Services

Year: 2025-Current

Oil Company: PEDEC

Operator: DANA SOHRAB

Depth (m): 3800±300

Temperature (F): 180-220

Wells: 6     

Rigs: 2

Cheshmeh Khosh
Drilling Fluid Services

Year: 2024-Current

Oil Company: PEDEC-ZNV 

Contractor: TDDC 

Depth (m): 3900-4300

Temperature (F): 200
Wells: 6    

Rigs: 3

Cheshme Khosh
Drilling Fluid Services

Year: 2022-Current     

Oil Company: PEDEC-ZNV 

Contractor: POSCO

Depth (m): 3900-4300

Temperature (F): 200

Wells: 2   

Rigs: 2

Arvand
Waste Management Services

Year: 2025-Current     

Oil Company: Arvandan

Contractor: KOGC 

Wells: 2   

Rigs:1

Cheshmeh Khosh
Waste Management Services

Year: 2024-Current     Oil Company: ZNV  Contractor: TDDC 
Wells: 6    Rigs: 3

Maroun
Waste Management Services

Year: 2024-Current     

Oil Company: NISOC

Contractor: NDCO
Wells: 2   

Rigs: 2

South Azadegan
Brine FIlteration

Year: 2021-Current     

Oil Company: PEDEC 

Contractor: TDDC

Wells: 17   

Rigs: 2

Ahwaz 1&4
Brine Filteration

Year: 2021-Current     

Oil Company: NISOC

Contractor: OEID

Wells: 15   

Rigs: 2

2023-South Pars Phase 12c

Abandonment

2022-South Pars Phase 17

Workover

2021-South Pars Phase 16

Appraisal

2020-YALDA

Exploration

2019-South Pars Phase 5

Workover

Waste Management